Some assembly required, French Ikea edition


When my family was visiting back around Christmas, I whined a bit about the previous year’s gift of a full set of large, heavy dishes to replace the lightweight, indestructible Corelle Ware that I was quite fond of. Not just because I didn’t need more dishes, but because I was already low on storage, and my brother had finally sent me my grandfather’s full set of monogrammed bar glassware. I said “what I really need is a good sideboard”, and twenty minutes later Mom called me over to show off several options she’d found on Wayfair.

The Parisot Ethan 6-footer was the one that fit best into the style and color of the rest of my kitchen, and they said it would be in stock on January 9th. So I figured that a few weeks into the new year, I’d have a place for my stuff.

Then the in-stock date got pushed back a few weeks. Then a few more. Then a few more. Finally, at 11:40am on April 1st, I received an in-stock email from Wayfair. At 7pm, I noticed the notice, placed the order, and was told it would ship on the 5th and arrive on the 12th. On the 5th, the ship date was revised to 5/16. On 5/17, the ship date was revised to 5/31. Mind you, I was billed on 4/1.

On the morning of 6/6, FedEx rang the bell and dropped off two large boxes containing a flat-packed sideboard and a small assembly pamphlet. (fortunately, Wayfair had a PDF of the assembly doc online, so the extent of the work required was not a surprise)

The “open first” box contained the instructions and a bag of parts. After carefully sorting and counting, I confirmed that they’d gotten it right:

Parisot Ethan sideboard assembly

(not pictured: drawer sliders, glue, and actual furniture components)

I did have to run out for replacement wood glue, though. The bottle I had was really old, and one of the two little tubes they shipped was punctured by a screw. Note to Parisot: next time, put the pointy things and the liquids in different baggies.

They estimate two hours, but I suspect they don’t include unpacking and sorting in that…

[Update: and done! Except for leveling the doors and drawers. And moving the bookshelf full of cookbooks that’s sitting where it needs to go. Etc, etc.]